Commercial Rooftop Photovoltaic Power Plant of Solar System 850kw

Produktbeschreibung

Industrial and commercial roofs have always been the darlings of the photovoltaic industry. Using idle industrial and commercial roofs to construct photovoltaic projects can not only reduce energy consumption, but also make full use of idle resources, which plays a role in energy conservation and emission reduction, and can bring huge economic benefits to enterprises. Benefits and environmental benefits can be said to serve multiple purposes.


The main advantages of JDSOLAR industrial and commercial roof distributed photovoltaic power generation system:
1. Reduce the use of high-priced electricity and peak electricity, and reduce business operating costs.
2. The investment recovery period is short and the rate of return is high.
3. Enjoy national and local subsidies and enjoy economic benefits.
4. Energy saving and emission reduction, low carbon emission, environmental protection and green.
5. The system is stable and reliable with a service life of over 30 years.
6. Modular design, convenient and flexible, simple later maintenance, no worries.
There are a lot of independent commercial roofs in China, such as supermarkets, shopping malls, parking lots, clubs, clubs, etc. These buildings have a lot of idle roofs, which can be used for spontaneous self-use surplus electricity Internet access projects.
Installation requirements for JDSOLAR industrial and commercial photovoltaic power generation
1. Local resources
For distributed photovoltaic site selection, priority should be given to areas with large solar radiation, less rainy weather, and less pollution. If the company is near the sea, anti-salt mist, anti-corrosion and anti-typhoon measures should be considered; if the area where the company is located is large, anti-sand and sand washing measures should be considered; if in cold areas, anti-freezing and snow removal measures should be considered.
2.Building roof conditions


Building ownership, design life, materials, area and orientation also directly affect the feasibility and installation of distributed photovoltaic power plants.
Building property rights are owned by the business owner or local government, which is suitable for development; the leased factory building is not suitable. During the development of the project, it is necessary to understand the useful life of the roof. The remaining useful life is too short to be developed.
At the same time, the azimuth of the roof, the tilt of the roof and the surrounding obstructions need to be measured during the survey, so as to determine the installed capacity and power generation of the system later.
3. Building roof load
The photovoltaic power plant needs to operate for 25 years. During the project inspection, it is necessary to focus on the design value of the constant load in the architectural design specification.
During the project survey, the project developer is required to obtain the house structure drawing from the owner to facilitate the calculation of the roof load.
4. Distribution facilities and grid connection points
Power distribution equipment is one of the basis for selecting grid-connected solutions for photovoltaic power stations. The main examination contents are:


1) Plant transformer capacity, quantity, bus coupling, load ratio, etc .;
2) Factory meter position, busbar specifications, switch specifications and models;
3) Whether the factory area is equipped with an independent power distribution room, whether there is a spare interval for power distribution equipment, and if not, can the busbar be crimped;
4) Prefer users with large transformer capacity and large load ratio;
5) Check the capacity of the main switch of the incoming line, and consider the revenue problem. The output current of the photovoltaic power generation system should not be greater than the capacity of the household switch;
6) Based on the principle of convenient and economical wiring, consider the installation position of the inverter and grid cabinet.
5. User electricity consumption and electricity price
The most important thing of distributed photovoltaic power generation project is the local consumption of the generated power, so we need to examine:
1) The average annual, monthly, and daily power consumption of the enterprise, the day-to-day power consumption, and the peak time and proportion of power consumption;
2) Enterprise electricity price, weighted electricity price during the day.
Commercial and industrial photovoltaic power generation has become a mainstream!
At present, logistics, ports, schools, hospitals in many provinces and cities, as well as the roofs of residents and the roofs of enterprises and institutions are still idle. From an investment perspective, because of state subsidy support and continuous operation for 25 years, industrial and commercial photovoltaic power generation systems are considered to be a better investment method. Because industrial electricity prices are more expensive than residential electricity prices, the electricity costs saved are generally more than 5- Pay back in 7 years.
 

Lieferfähigkeit

Verpackung und Versand

Vorlaufzeit:
Hafen:
Verpackungsdetails:
>=1000 w

US 0.35

Kontakt


Kommentare
Willkommen bei unzuun Kommentaren! Bitte halten Sie die Gespräche höflich und thematisch. Um produktive und respektvolle Gespräche zu fördern, Sie können Kommentare von unseren Community Managern sehen.
Melden Sie sich an, um zu posten
Sortieren nach
Melden Sie sich an, um weitere Kommentare anzuzeigen

Diese Inserate könnten Sie auchinteressieren.
Meo Machinery Co.LTD

3kw 5kw 10kw hybrid solar power system solar panels for electricity station Solar Farm Mounting for Home roof Energy 23

Meo Machinery Co.LTD

Alta eficiencia lr4 bifacial mono sin marco solar pv módulo 415w 420w 430w con la mitad de la Corte de la tecnología

Meo Machinery Co.LTD

Bomba de agua Solar para riego por goteo, bomba de Motor Solar para agricultura

Meo Machinery Co.LTD

Inversores para 15kw sistema de energia solar, energia fotovoltaica planta sistema solar 10kw estação de equipamento na grade x139

Meo Machinery Co.LTD

sunlock mounting sunmodo roof mount ground mount solar frame

Meo Machinery Co.LTD

3kW solar power air conditioning system with battery

Meo Machinery Co.LTD

Techfine 12kw inversor solar 15kw 15kva inversor solar fuera de la red inversor solar para aire acondicionado de bienvenida

Meo Machinery Co.LTD

PV3300 TLV Inverter Charger 5000W 48v Split Phase 120 240v Hybrid Inverter 5 in 1

Meo Machinery Co.LTD

Eternit Painel Montagens Planas Novo Design Todo o Sistema Solar Telhado Suporte de Montagem

Meo Machinery Co.LTD

Wind solar hybrid charge mppt controller for 300W to 600W Turbines

Meo Machinery Co.LTD

Goodwe 3KW 4KW 5KW 3000W 4000W 5000W malaysia grid tie phase inverter for solar

Meo Machinery Co.LTD

Component voltage up to 150v high voltage input mppt charge controller