asphalt/ bitumen in China Pavement Seal coating

Produktbeschreibung

Overview
Quick Details
Place of Origin:
Anhui, China
Brand Name:
Roadphalt
Model Number:
Silicone-modified Asphalt
Type:
Modified Bitumen
Grade:
Top grade
Colors:
Black
Appearance:
Liquid
Supply Ability
Supply Ability:
10,000 Ton/Tons per Week
Packaging & Delivery

Roadphalt Silicone-modified Asphalt

 

Plant profile

 

  Our company owns research labs, a large-scale manufacturing and processing plant and a nationwide sales network. We cooperate with world renowned scientific institution for pavement, and learn from established scientific results and application technology from other countries. We also join hands with the Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongji University on long-term collaboration to develop such products as colored pavement material, road maintenance material, special asphalt and asphalt processing equipment.

 

 

Being “science-led and service-oriented” is our principle. So far we have applied for 124 national patents, owned 7 national patents, won 1 nation-level innovation fund and 2 Shanghai innovation fund. We are recognized as a nation-level high-tech enterprise, Shanghai energy-saving and environment-protecting enterprise, outstanding Shanghai enterprise that converts new technological achievements into productivity, and Shanghai patent activity experimental enterprise, having established the brand of “Roadphalt”.

 

 

 

 

 

Product Profile

 

 

Physical propertied

Specific gravity

Color

Viscosity (25°C)

Smell

Smoke

0.85-0.90 g/cm3

Black

50-200 cps

Slight tarry smell  

No

 

Performance test on the evaporation residue after TFOT

Items

Test method

Index

Solid content

 

≥45%

Solubility (trichloroethylene)

T 0607-1993

≥97%

 

Application Scope

Roadphalt SAP series preventive curing agent for asphalt pavement, as an economical and ideal Repair/ protection agent, can 

be used in a variety of asphalt pavements

 

Product Features


Construction Guide  

 

 

 

 

Traffic Opening Time

Specific conditioned time is closely related to weather, and generally 2-3 hours after spray traffic is opened.

 Typical project

 

Certificate

 


Lieferfähigkeit

Verpackung und Versand

Vorlaufzeit:
Hafen:
Verpackungsdetails:
>=1 Tonne(n)

US 1800.00-2586.00

Kontakt


Kommentare
Willkommen bei unzuun Kommentaren! Bitte halten Sie die Gespräche höflich und thematisch. Um produktive und respektvolle Gespräche zu fördern, Sie können Kommentare von unseren Community Managern sehen.
Melden Sie sich an, um zu posten
Sortieren nach
Melden Sie sich an, um weitere Kommentare anzuzeigen

Diese Inserate könnten Sie auchinteressieren.