Asphalt manufacturer Roadphalt Cold Premix Asphalt

Produktbeschreibung

Overview
Quick Details
Place of Origin:
Anhui, China
Brand Name:
Roadphalt
Model Number:
AC-5;AC-10;AC-13;AC-14
Type:
Road Tar
Grade:
Top quality
Softening Point:
N/A
The color:
black
The packing:
15kg/bag; 20kg/bag; 25kg/bag; 1 Ton/bag
The brand:
Roadphalt (PPT)
The performance:
repair all the road potholes
The advantages:
All -weather cold paving materials (permanent repair )
The Product Status:
mixture, donn't need any processing production)
The construction:
easy contruction
The Wide applicability:
highway, airport , sidewalk , Bicycle path, and all the road
The Storage time:
2 years
The high material utilization:
100% utilization (no any waste)
Supply Ability
Supply Ability:
10,000,000,000 Ton/Tons per Week
Packaging & Delivery

Asphalt plant  produce cold premix asphalt

 

Company Information

 

  Our company owns research labs, a large-scale manufacturing and processing plant and a nationwide sales network. We cooperate with world renowned scientific institution for pavement, and learn from established scientific results and application technology from other countries. We also join hands with the Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongji University on long-term collaboration to develop such products as colored pavement material, road maintenance material, special asphalt and asphalt processing equipment.

Being “science-led and service-oriented” is our principle. So far we have applied for 124 national patents, owned 7 national patents, won 1 nation-level innovation fund and 2 Shanghai innovation fund. We are recognized as a nation-level high-tech enterprise, Shanghai energy-saving and environment-protecting enterprise, outstanding Shanghai enterprise that converts new technological achievements into productivity, and Shanghai patent activity experimental enterprise, having established the brand of “Roadphalt”.

 

 

 

Product Description

 

 

 

 

 

 

 

 

 

 

 

 

 

Roadphalt all-weather cold paving material is a kind of high-tech road patching material, mixed and prepared by using Roadphalt high-performance cold paving additive, asphalt and aggregate according to certain processing technology, with an appearance of black grain-like solid, slight petroleum smell, insoluble in water, insensitive to motive impact and static electricity, and with stable properties.

 

 

 

 

Prepaire area

pit depth

Recommendations mixture gradation

<0.3m

---------

AC-05 or AC-10

0.3-0.5 m2

3cm

AC-05

4-5cm

AC-10

6-7cm

AC-16

>0.5

2cm

AC-05

3-4cm

AC-10

5-6cm

AC-16

 

 

 

 

 

 

Comparison among cold paving asphalt, hot paving asphalt and emulsified asphalt

 

 

 Items

 

Roadphalt cold asphalt mixture

 

Hot paving asphalt mixture

Emulsified asphalt mixture

Construction seasons

 

 

Be constructed in all weather in a whole year, not influenced by winter or raining/snowing weather

Not constructed in low temperature winter and raining weather

The temperature is required not below 5°C, and the construction time is longer then the hot paving.

Holes/trench treatment

 

 

Just simple treatment, the holes/trench with gathered water can be filled directly 

Cleaning-up, removing gathered water, drying them up, and brushing with bonding oil are necessary 

Cleaning-up, shaping and removing gathered water are necessary 

Storage

 

 

The fill-bag sealed finished product can be stored as long as two years at room temperature

Can not be stored

Stored for 3-7 days or longer at 20°C 

Construction performance

 

 

Neither proficient workers nor special machines is needed

Proficient workers and special machines are needed

Proficient workers and special machines are needed

Production environment

 

 

 

Can be produced locally or pre-stirred in factory, without the smell of hot asphalt 

Stirring in factory is needed, with heavy smell of hot asphalt

Pre-stirring in factory is needed

Utilization rate of the material

 

 

Be taken at anytime if needed, and the left material can be used for next time.

The taken amount is more than the utilized amount, and the left material is invalid.

The material can not be used again after the emulsion breaks

Opening for the traffic

 

 

The traffic is opened immediately after the patching is finished.

The traffic is closed for a period after the patching is finished

The traffic is closed after the patching is finished, waiting for the emulsion to break.

Durability

 

 

The lifetime is as long as 10 years

Ordinary

Ordinary

Consume of energy

 

 

The stone materials are generally not required to be heated, and the temperature of asphalt is low, so the energy is saved.

the stone materials and asphalt are required to be heated

Amount of asphalt consumed is 10% less than that of the hot patching material, and the stone materials is not heated, and the temperature of asphalt is high.

Material consume 

 

 

Repeated repairs are reduced and material is saved; the shutdown cost caused by winter and raining weather is reduced

Waste is caused by taking larger amount of material to keep it warm; and the damage aggravates due to the patching can not be constructed at any time.

Generally the patching can be constructed in time, and the amount is taken according to the actual need. The cost on the shutdown of the construction and the machines is reduced to some extent. 

Social benefit

 

 

Patching is constructed at any time to maintain the pavement fresh all the time, which makes the traffic smooth, reduces traffic accidents and the patching times, and prolongs the serving life of the roads.

The patching can not be constructed at any time, which aggravates the impairment, influences the traffic, and reduces the serving life of the roads.

The patching time is a little long, which influences the traffic.

 

 

 

 

Lieferfähigkeit

Verpackung und Versand

Vorlaufzeit:
Hafen:
Verpackungsdetails:
>=1 Tonne(n)

US 310.00-355.00

Kontakt


Kommentare
Willkommen bei unzuun Kommentaren! Bitte halten Sie die Gespräche höflich und thematisch. Um produktive und respektvolle Gespräche zu fördern, Sie können Kommentare von unseren Community Managern sehen.
Melden Sie sich an, um zu posten
Sortieren nach
Melden Sie sich an, um weitere Kommentare anzuzeigen

Diese Inserate könnten Sie auchinteressieren.
Meo Machinery Co.LTD

KP-PM200W Solar Panel and solar generator with panel completed set

Meo Machinery Co.LTD

China top 10 brand A grade Jinko 540w solar panel for solar energy system

Meo Machinery Co.LTD

SINCR 5kw off grid solar water pump inverter with built-in mppt charge controller

Meo Machinery Co.LTD

ALLTOP Cheap Price 330w 335w 340w 345w 350w Hybrid System 5bb 6bb 9bb Roof Mono Crystalline Solar Panel

Meo Machinery Co.LTD

3000W Pure Sine Wave Portable Power Pack with 2 x 200W Solar Panels extra purchasing

Meo Machinery Co.LTD

economical home usage very easy install sloped roof pitched tile roof solar mounting structure

Meo Machinery Co.LTD

Free Shipping solar 590W 600W cheap soar panels for sale

Meo Machinery Co.LTD

The charging function 10KW 20KW 30KW on and off Grid solar power inverter for home ues 5 years

Meo Machinery Co.LTD

Customized Solar Controller PWM Solar Charge Controller 30A 12V 24V Resale Use

Meo Machinery Co.LTD

shingled and halfcell solar panel solar pannel 500w portable solar panel 500w mono crystalline solar panel 500w

Meo Machinery Co.LTD

20kw Solar System Off Grid Solar Energy System 20kw Photovoltaic

Meo Machinery Co.LTD

China factory direct sale international solar panel 10 kw with after-sales service provided for Turkey