Commercial Rooftop Photovoltaic Power Plant of Solar System 900kw
Commercial Rooftop Photovoltaic Power Plant of Solar System 900kw
Produktbeschreibung
Industrial and commercial roofs have always been the darlings of the photovoltaic industry. Using idle industrial and commercial roofs to construct photovoltaic projects can not only reduce energy consumption, but also make full use of idle resources, which plays a role in energy conservation and emission reduction, and can bring huge economic benefits to enterprises. Benefits and environmental benefits can be said to serve multiple purposes.
The main advantages of JDSOLAR industrial and commercial roof distributed photovoltaic power generation system:
1. Reduce the use of high-priced electricity and peak electricity, and reduce business operating costs.
2. The investment recovery period is short and the rate of return is high.
3. Enjoy national and local subsidies and enjoy economic benefits.
4. Energy saving and emission reduction, low carbon emission, environmental protection and green.
5. The system is stable and reliable with a service life of over 30 years.
6. Modular design, convenient and flexible, simple later maintenance, no worries.
There are a lot of independent commercial roofs in China, such as supermarkets, shopping malls, parking lots, clubs, clubs, etc. These buildings have a lot of idle roofs, which can be used for spontaneous self-use surplus electricity Internet access projects.
Installation requirements for JDSOLAR industrial and commercial photovoltaic power generation
1. Local resources
For distributed photovoltaic site selection, priority should be given to areas with large solar radiation, less rainy weather, and less pollution. If the company is near the sea, anti-salt mist, anti-corrosion and anti-typhoon measures should be considered; if the area where the company is located is large, anti-sand and sand washing measures should be considered; if in cold areas, anti-freezing and snow removal measures should be considered.
2.Building roof conditions
Building ownership, design life, materials, area and orientation also directly affect the feasibility and installation of distributed photovoltaic power plants.
Building property rights are owned by the business owner or local government, which is suitable for development; the leased factory building is not suitable. During the development of the project, it is necessary to understand the useful life of the roof. The remaining useful life is too short to be developed.
At the same time, the azimuth of the roof, the tilt of the roof and the surrounding obstructions need to be measured during the survey, so as to determine the installed capacity and power generation of the system later.
3. Building roof load
The photovoltaic power plant needs to operate for 25 years. During the project inspection, it is necessary to focus on the design value of the constant load in the architectural design specification.
During the project survey, the project developer is required to obtain the house structure drawing from the owner to facilitate the calculation of the roof load.
4. Distribution facilities and grid connection points
Power distribution equipment is one of the basis for selecting grid-connected solutions for photovoltaic power stations. The main examination contents are:
1) Plant transformer capacity, quantity, bus coupling, load ratio, etc .;
2) Factory meter position, busbar specifications, switch specifications and models;
3) Whether the factory area is equipped with an independent power distribution room, whether there is a spare interval for power distribution equipment, and if not, can the busbar be crimped;
4) Prefer users with large transformer capacity and large load ratio;
5) Check the capacity of the main switch of the incoming line, and consider the revenue problem. The output current of the photovoltaic power generation system should not be greater than the capacity of the household switch;
6) Based on the principle of convenient and economical wiring, consider the installation position of the inverter and grid cabinet.
5. User electricity consumption and electricity price
The most important thing of distributed photovoltaic power generation project is the local consumption of the generated power, so we need to examine:
1) The average annual, monthly, and daily power consumption of the enterprise, the day-to-day power consumption, and the peak time and proportion of power consumption;
2) Enterprise electricity price, weighted electricity price during the day.
Commercial and industrial photovoltaic power generation has become a mainstream!
At present, logistics, ports, schools, hospitals in many provinces and cities, as well as the roofs of residents and the roofs of enterprises and institutions are still idle. From an investment perspective, because of state subsidy support and continuous operation for 25 years, industrial and commercial photovoltaic power generation systems are considered to be a better investment method. Because industrial electricity prices are more expensive than residential electricity prices, the electricity costs saved are generally more than 5- Pay back in 7 years.
The main advantages of JDSOLAR industrial and commercial roof distributed photovoltaic power generation system:
1. Reduce the use of high-priced electricity and peak electricity, and reduce business operating costs.
2. The investment recovery period is short and the rate of return is high.
3. Enjoy national and local subsidies and enjoy economic benefits.
4. Energy saving and emission reduction, low carbon emission, environmental protection and green.
5. The system is stable and reliable with a service life of over 30 years.
6. Modular design, convenient and flexible, simple later maintenance, no worries.
There are a lot of independent commercial roofs in China, such as supermarkets, shopping malls, parking lots, clubs, clubs, etc. These buildings have a lot of idle roofs, which can be used for spontaneous self-use surplus electricity Internet access projects.
Installation requirements for JDSOLAR industrial and commercial photovoltaic power generation
1. Local resources
For distributed photovoltaic site selection, priority should be given to areas with large solar radiation, less rainy weather, and less pollution. If the company is near the sea, anti-salt mist, anti-corrosion and anti-typhoon measures should be considered; if the area where the company is located is large, anti-sand and sand washing measures should be considered; if in cold areas, anti-freezing and snow removal measures should be considered.
2.Building roof conditions
Building ownership, design life, materials, area and orientation also directly affect the feasibility and installation of distributed photovoltaic power plants.
Building property rights are owned by the business owner or local government, which is suitable for development; the leased factory building is not suitable. During the development of the project, it is necessary to understand the useful life of the roof. The remaining useful life is too short to be developed.
At the same time, the azimuth of the roof, the tilt of the roof and the surrounding obstructions need to be measured during the survey, so as to determine the installed capacity and power generation of the system later.
3. Building roof load
The photovoltaic power plant needs to operate for 25 years. During the project inspection, it is necessary to focus on the design value of the constant load in the architectural design specification.
During the project survey, the project developer is required to obtain the house structure drawing from the owner to facilitate the calculation of the roof load.
4. Distribution facilities and grid connection points
Power distribution equipment is one of the basis for selecting grid-connected solutions for photovoltaic power stations. The main examination contents are:
1) Plant transformer capacity, quantity, bus coupling, load ratio, etc .;
2) Factory meter position, busbar specifications, switch specifications and models;
3) Whether the factory area is equipped with an independent power distribution room, whether there is a spare interval for power distribution equipment, and if not, can the busbar be crimped;
4) Prefer users with large transformer capacity and large load ratio;
5) Check the capacity of the main switch of the incoming line, and consider the revenue problem. The output current of the photovoltaic power generation system should not be greater than the capacity of the household switch;
6) Based on the principle of convenient and economical wiring, consider the installation position of the inverter and grid cabinet.
5. User electricity consumption and electricity price
The most important thing of distributed photovoltaic power generation project is the local consumption of the generated power, so we need to examine:
1) The average annual, monthly, and daily power consumption of the enterprise, the day-to-day power consumption, and the peak time and proportion of power consumption;
2) Enterprise electricity price, weighted electricity price during the day.
Commercial and industrial photovoltaic power generation has become a mainstream!
At present, logistics, ports, schools, hospitals in many provinces and cities, as well as the roofs of residents and the roofs of enterprises and institutions are still idle. From an investment perspective, because of state subsidy support and continuous operation for 25 years, industrial and commercial photovoltaic power generation systems are considered to be a better investment method. Because industrial electricity prices are more expensive than residential electricity prices, the electricity costs saved are generally more than 5- Pay back in 7 years.
Lieferfähigkeit
Verpackung und Versand
- Vorlaufzeit:
- Hafen:
- Verpackungsdetails:
>=1000 w
US 0.35
Kommentare
Willkommen bei unzuun Kommentaren! Bitte halten Sie die Gespräche höflich und thematisch. Um produktive und respektvolle Gespräche zu fördern,
Sie können Kommentare von unseren Community Managern sehen.
Melden Sie sich an, um zu posten
Melden Sie sich an, um weitere Kommentare anzuzeigen
Diese Inserate könnten Sie auchinteressieren.
Meo Machinery Co.LTD
Yüksek kaliteli AYIN odun kömürü briket barbekü için
Meo Machinery Co.LTD
Carvão chama 60pcs sliver sliver carvão vegetal do shisha carvão vegetal do shisha com inflama rapidamente estilo Japonês
Meo Machinery Co.LTD
Eco-friendly Lychee Lichy Longan Charcoal with competitive price from Vietnam
Meo Machinery Co.LTD
En iyi kalite fiyat 1 kg kömür hindistan altın dokunmatik gümüş siyah nargile hiçbir ses yok sigara nargile kömür mangal kömürü
Meo Machinery Co.LTD
Kolay kullanım büyük barbekü ızgara çok fonksiyonlu kömür ızgara
Meo Machinery Co.LTD
Need lump wood charcoal POWDER hard wood charcoal for barbecue From Traders
Meo Machinery Co.LTD
Products exporter Best Quality 100% Pure Coconut Shell coco hookah charcoal smokeless
Meo Machinery Co.LTD
Hot Sale Smokeless and Smelless 100% Pure Coco Shisha Cube Natural Coconut Cube Coconut Shell Charcoal
Meo Machinery Co.LTD
SMOKELESS HEXAGONAL OR SQUARE MACHINE MADE CHARCOAL POPULAR IN EUROPE AND MIDDLE EAST
Meo Machinery Co.LTD
Preço Barato por atacado de Alta Qualidade do Carvão Vegetal da Serragem Exportação para EMIRADOS ÁRABES UNIDOS e no Japão
Meo Machinery Co.LTD
Doğal parke götürü khaya/kahve kömür barbekü için UAE/İsrail/bahreyn/suudi arabistan pazarları yapılan vietnam
Meo Machinery Co.LTD