Go Green Cold Mix Colored Bitumen

Produktbeschreibung

Overview
Quick Details
Place of Origin:
Shanghai, China
Brand Name:
Go Green
Model Number:
GPC02
Type:
Petroleum Asphalt
Grade:
Top quality
Softening Point:
N/M
Color:
Red,Green,Blue
Supply Ability
Supply Ability:
1000000 Ton/Tons per Month
Packaging & Delivery

Go Green Micro-Paving Cold Mix Colored Bitumen 

 

Go Green Micro-Paving Cold Mix Colored asphalt is patented high technology product. It is a durable, weather resistant material and is used mainly on roads, car parks, and path ways. It is also a cost effective environmentally friendly material. Paving thickness only 1.0-1.2cm which greatly reduced the material cost.

 

Different color avaiable ! 

 

Main Features of Go Green Micro-Paving Cold Mix Colored Asphalt.


Go Green Micro-Paving Cold Mix Color Asphalt has some basic performances such as soft, easy to compact, water stability, long shelf time, excellent strength, construction at normal temperature, they are generally described as follows:

 

A. Cold mix technology. Paving thickness only 1.0-1.2cm.

B. Noise reduction, Anti-slip and Fog-proof.

C. Stick to the original pavement surface closely

D. Storage up to 6 month

E. Excellent resistance to water damage.

F. Environmental Protection

G. Construction time no limitation.

H Different color available, lively colors protection 

I, Open to traffic after six hours..

 

Package:  20kg bags or 1 ton bags. 

 

Application Area:

 

Highway, Urban street , Public Park, Bus lane, Bridge, Tunnel,  Landscape driveway, Rain sensitive areas.

 

More Functions:

 

Go Green Micro-Paving Cold Mix Color Asphaltcan also be used for original black asphalt pavement reconstruction, its re-paved in the orignal pavemnt, can effectively improve the existing pavement surface smoothness.

  

Construction Instructions:                             

 

Step one:

 

Preparation

 

1.   The product construction temperate should be above 0°C, recommend to construct above 5 °C

 

2.   Clean the Debris of the road. The surface should be free of ice, standing water, snow, and loose material.

 

 

Step two:

 

Paving 0.7-1.5cm thickness by standard asphalt paver.

  

Step Three:

 

Compact the surface as soon as possible, after  1-2 hours, compact 4-5 times to guarantee the compaction without crashing aggregate.

 

 

 

Step Four:  

 

Close traffic completely after construction. till pavement surface is dry and hard

depends on the weather, usually open to traffic after 6 hours. 

 

 

Lieferfähigkeit

Verpackung und Versand

Vorlaufzeit:
Hafen:
Verpackungsdetails:
>=20 Tonne(n)

US 427.00-596.00

Kontakt


Kommentare
Willkommen bei unzuun Kommentaren! Bitte halten Sie die Gespräche höflich und thematisch. Um produktive und respektvolle Gespräche zu fördern, Sie können Kommentare von unseren Community Managern sehen.
Melden Sie sich an, um zu posten
Sortieren nach
Melden Sie sich an, um weitere Kommentare anzuzeigen

Diese Inserate könnten Sie auchinteressieren.