PV Solar Panel Mounting Bracket/Structure
Produktbeschreibung
The steel structure bracket is hot-dipped zinc, with coating thickness of 60μm or more, and the thickness of the bracket is 2.0mm or more. The hot-dipped zinc conforms to the GB/ t13912-2002 galvanizing standard. The bracket can withstand the basic wind pressure of 0.85kn /m2, the basic snow pressure of 0.6kn /m2, and can resist the earthquake of magnitude 7. Smooth surface without burrs, rust spots and other defects, supporting fasteners should be hot dip zinc or stainless steel materials. The profile of aluminum alloy can be assembled quickly on site. The supporting fasteners are made of stainless steel. Meet the site assembly requirements, the supporting fasteners used stainless steel material.
Fixed base profile with standard loaders and modular connectors. Adopt the corresponding reliable fixation method for different working conditions to ensure the safe and reliable use of the bracket.
The connection design between the photovoltaic module and the installed c-section steel adopts the dismountable structure, and the fixation methods such as bonding and welding are not adopted.
The detachable structural components are made of non-rusting aluminum alloy, and the connection is strong enough to ensure that the pv modules do not fall off under any natural weather conditions. There is a gap between the aluminum profile joint to ensure the hot expansion and cold shrinkage between the photovoltaic modules and the mounting keel. The keel can be bolted to the reserved holes directly connected to the lower bracket or roof.
Performance description:
1) the surface passivation treatment is durable, which can effectively prevent the external environment from corroding the profile.
2) the profile structure is made by moulding according to the actual installation, which is reasonable to connect with other parts, easy to install and suitable for large-scale projects.
Project Show
Company profile
Payment & Delivery
Payment terms | T/T | EXW | 30% In advance, 70% before delivery |
FOB | |||
CFR/C&F | 30% In advance, 70% against copy of B/L | ||
CIF | |||
L/C | Total amount above USD70,000, we accept L/C at sight | ||
West Union | Total amount less than USD5,000 | ||
PayPal | |||
Delivery time | 15-20 working days after receiving down payment for one container |
We accept OEM and small trial orders, contacting with us now for more information. All inquiries will be replied within 24 hours.
FAQ
Q1: What are differences among grid-tied, off grid and hybrid solar power system?
A1: Grid-tied system works based on the national grid. If there is without the national utility, the system can not word.
Off grid system can word without the national grid, but if there is national grid, which can be a back up power for the off grid system
Hybrid system, which combine the function of grid-tied and off grid. All in all, it's a grid-tied system, but can also store the power in the battery.
Q2: How about the leading time?
A2: After receiving deposit, 20-30 days.
Q3: How many years of warranty for the solar system?
A3: For the each of accessories, the warranties are different. Solar panel has 10- years linear output warranty and 25years life span. Contorller, inverter and battery has 5-10years warranty years warranty.bracket has 10 years warranty.
Q4: How to design a suitable solar power system?
A4: Just contact our sales engineer, who will design the full set of solution for you based on your really needs with the most competitive cost.
Lieferfähigkeit
Verpackung und Versand
- Vorlaufzeit:
- Hafen:
- Verpackungsdetails: