Reburnishment Service of Combuster Basket for GE Gas Turbine Model MS6001B

Produktbeschreibung

Overview
Quick Details
Condition:
New
Warranty:
6 months
Applicable Industries:
Energy & Mining
Showroom Location:
None
Place of Origin:
Sichuan, China
Brand Name:
DTEC
Model Number:
MS6001B
Type:
Plant
Electricity Generator Type:
Thermal Power
Output Voltage (V):
380
Key Selling Points:
COMBUSTION LINER
After-sales Service Provided:
Online support
Local Service Location:
None
Application:
gas turbine spare parts
Name:
Combuster Basket for GE Gas Turbine Model MS6001B
Certificate:
ISO9001:2008
Raw material:
alloy steel
Brand:
DTEC
Service:
After sale service provided
Supply Ability
Supply Ability:
20 Set/Sets per Month
Packaging & Delivery

 Reburnishment Service of Combuster Basket for GE  Gas Turbine Model MS6001B

 

Gas turbine Blade Reburnishment

Gas turbine nozzle Reburnishment

I. Industry Chain Service of Gas Turbine Unit

 

 

Using the company's influence in the industry of aviation, energy, relying on good relationship with GE, Siemens, we can independently supply the whole industry chain services, such as complete gas turbine sets, turbine engineering construction take over, power plant operation maintenance, unit maintenance and supply GE spare parts.

 

 

Successively in the domestic and foreign completed the American GE company, general - Hui and Sora company, Alstom, Siemens, Hitachi, Kawasaki company, United Kingdom Romania - Romanian companies, and domestic unit installation, commissioning and maintenance work, such as LM2500, LM5000,LM6000,MS1002D,MS5001,MS6001,MS9001E,PGT5,PGT10,GT13D,GT13E2,FT8Twin,SD15HE,TAURUS60,MARS100,TITAN130,TYPHOON,SK15HE,WP6,QD70,QD128,QD100,R0110,M251S,H25, CENTAUR40,TORNADO, W101,KG5,251B11,V94.2,251S,TB5000, etc. More than 700 times of gas turbine generating unit installation and maintenance engineering, related to more than 100 owners.

 

 

                                                                        Main Service

A.Spare Parts

 

Many types of rotating blades, guide vane, turbine flame tube, transition piece, turbine stator blade, ring, fastener, bearing liner repair and manufacturing.

 

 

 

 

 

 

 

B.Installation, commissioning, operation and maintenance of power plant

 

 

Gas turbine power station installation, commissioning, maintenance and after-sales service work mainly by the company technical staff, can be independently completed a variety of models of gas turbine overhaul and minor repairs.

 

 

Gas turbine overhaul: gas turbine intake and exhaust inspection; intake adjustable guide vane(IGV) examination; compressor and static blade inspection; turbine rotating blades and stator

blades inspection; rotor check; front bearings and after bearings inspection; gas turbine cylinder inspection; combustion chamber and the inner cylinder inspection; clutch inspection; shafting alignment; gas turbine commissioning period of dynamic balance.

 

 

 

 Regular inspection of auxiliary system: turning gear inspection; main, auxiliary and emergency lube oil pump inspection; jacking oil pump inspection; exhaust fan check; tank and oil filter check and clean; lubricating oil pipe and gas pipe inspection.

 

 

Generator overhaul: extract and check out generator rotor; inspection for front and after part of generator bearings; generator stator check; generator electrical preventive test; generator transformer group protection equipment inspection and verification; generator transformer group control signal loop check and transmission test and so on.

 

 

 

 II. Pictures of Gas Turbine Project

 

 

 

 

Gas Turbine Unit Supply

 

Lieferfähigkeit

Verpackung und Versand

Vorlaufzeit:
Hafen:
Verpackungsdetails:
>=1 Set(s)

US 5000.00-10000.00

Kontakt


Kommentare
Willkommen bei unzuun Kommentaren! Bitte halten Sie die Gespräche höflich und thematisch. Um produktive und respektvolle Gespräche zu fördern, Sie können Kommentare von unseren Community Managern sehen.
Melden Sie sich an, um zu posten
Sortieren nach
Melden Sie sich an, um weitere Kommentare anzuzeigen

Diese Inserate könnten Sie auchinteressieren.
Meo Machinery Co.LTD

Pure Sine Wave Inverter 10000w 12000w 15000w 15kva 17kva Three Phase 400v on Grid Solar Inverters IP65 Grid Tie 5 Years

Meo Machinery Co.LTD

SNADI Hybrid Solar Inverter MPPT 24V 48V 3.5KW 5.5KW running without battery

Meo Machinery Co.LTD

Hot Sell 3KVA/3kw Hybrid Solar Inverter With Mppt Charge Controller Inverters & Converters

Meo Machinery Co.LTD

Low frequency 8000w ac 110v 220v output off grid solar inverter with mppt solar charge controller

Meo Machinery Co.LTD

5KW 48V Solar Power System Inverter MPPT Controller DC To AC Pure Sine Wave 5000W Hybrid Solar Inverter

Meo Machinery Co.LTD

China price solar inverter 2000Wsolar inverters 2KW solar system use inverter

Meo Machinery Co.LTD

Best price Deye 3kw single Phase solar inverter efficient for home system 3000va 2kw 1kw

Meo Machinery Co.LTD

Growatt 1Kva 2Kva 3Kva 1 Phase Mic Series Mppt Solar Grid Tie Inverter PV For House

Meo Machinery Co.LTD

high protection 120VAC VFD low voltage 2.2KW single phase solar inverter 50hz 60hz

Meo Machinery Co.LTD

5KW Grid Tied Inverter 2KVA 3KVA 5KVA Sofar Solar Power Inverter for Energy System

Meo Machinery Co.LTD

high efficiency Grid tied 3000w 5000w pv dc to ac solar inverter without battery

Meo Machinery Co.LTD

solax hybrid inverter 3kw 5kw 10kw on-grid off-grid solar system with black 380w mono panel home power station