Stable good quality low-speed heavy-duty friction parts 600 celsius high temperature EP grease
Produktbeschreibung
| Product Name | IBG-201 600℃ High Temperature EP Grease |
| Description | This product is made of high grade special synthetic base oil, thickened by various thickeners, added with a variaty of additives including anti corrosion, special solid lubricant. |
| Application | Applied to large scale high temperature, heavy-duty conveyor chains, low-speed heavy-duty friction parts in metallurgical industry etc. Lubrication of high temperature parts where sliding is the main friction method. Suitable for parts where white grease is necessary. |








Q1) I didn't find the oil / grease which I need in this page?
A1) If you didn't find the species of cables you need, please contact us directly, we will reply you quickly.
Q2) Are you a trading company or manufacturer?
A2) We are professional manufacturer in Hangzhou, China.
Q3) What is the MOQ?
A3) Mostly we sell from stock for normal items, you can buy any quantity unless it is customized-made.
Q4) Can you offer me a free sample?
A4) Yes, after price confirmation, you can require for samples to check our quality.
Sample is free but the freight charge should be paid.
Q5) How long to get the sample?
A5) After you pay the freight charge and send us confirmed files, the samples will be ready for delivery
in 3-7 days. The samples will be sent to you via express and arrive in 3~5 days.
Q6) Can you send products to my country?
A6) Sure, we can. If you do not have your own ship forwarder, we can arrange for you.
Q7) Can you do OEM for me?
A7) We accept all OEM orders, just contact us and give me your design, we will offer you a reasonable
price and make samples for you ASAP.
Q8) How is your package?
A8) 0.45kg, 0.8kg, 15kg, 180kg in plastic / metal containers,
adjustable according to customers’ requirements
Q9) How is the payment?
A9) T/T, L/C accepted. 30-50% deposit in advance, balance before shipment.
Q10) How can I place the order?
A10) First sign the PI, pay deposit, then the production will be arranged. Goods will be shipped,
after balance payment made.
Q11) What is the lead time for mass production?
A11) Honestly, it depends on the order quantity and the season you place the order.
Generally it takes 3-14 days, upon order confirmed, and payment received.
But we suggest that you start inquiry one-two months before the date you would like to get the
products at your country.
Q12) When can I get the quotation ?
A12) Usually the quote is made within 24 hours after your inquiry reaches us.
If it is urgent to get the quotation, please call us or tell us in your mail, so that your inquiry will
be processed with priority.
Q13) Welcome your inquiry!
A13) Any question please feel free to contact me. Factory Add: TangLangSun Village, Linpu Town,
Xiaoshan District, Hangzhou City, Zhejiang Province, P. R. China;
Lieferfähigkeit
Verpackung und Versand
- Vorlaufzeit:
- Hafen:
- Verpackungsdetails:
